| 245 | _aConstruction contractor`s claims analysis: an integrated system approach | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _vResearch and Information 19(1) January-February 19 |
||
| 520 | _aIntroduced here is an integrated computerised system designed to analyse construction contractors claims arising from delays. Categorises the types of delay and the consequent claims, before reviewing the analysis procedure. The computer model designed to replace existing methods is described, with flow diagrams as illustration. | ||