100 _aHarris, F.
245 _aConstruction contractor`s claims analysis: an integrated system approach
350 _a0
490 _aBuilding
_vResearch and Information 19(1) January-February 19
520 _aIntroduced here is an integrated computerised system designed to analyse construction contractors claims arising from delays. Categorises the types of delay and the consequent claims, before reviewing the analysis procedure. The computer model designed to replace existing methods is described, with flow diagrams as illustration.
650 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
650 _aCOMPUTERS
650 _aCONSTRUCTION PROJECTS
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS