000 00960cab a2200217 4500
001 ABS37504
008 090401t1987 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u4988
041 _aeng
100 _aDeal, J.
245 _aReducing the risk of legionnaires
260 _c1987
350 _a0
490 _aBuilding Technology & Management
_v25(2) April/May 1987, 24-27(4)
520 _aPaper presented at the ACIB/CIBSE Conference on Legionnaires Disease . From the point of view of the contractor, the paper discusses steps to reduce risks beginning with the design stage and following with procurement, construction, commissioning and testing and handover and maintenance stages.
650 _aBUILT ENVIRONMENT-BUILDING ELEMENTS-COMPLETE BUILDING SERVICES ELEMENTS-COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS
650 _aCOOLING TOWERS
690 _aBUILT ENVIRONMENT-BUILDING STANDARDS
942 _n0
948 _c04/03/1997
999 _c3004
_d3004