| 000 | 00960cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS37504 | ||
| 008 | 090401t1987 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u4988 | ||
| 041 | _aeng | ||
| 100 | _aDeal, J. | ||
| 245 | _aReducing the risk of legionnaires | ||
| 260 | _c1987 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Technology & Management _v25(2) April/May 1987, 24-27(4) |
||
| 520 | _aPaper presented at the ACIB/CIBSE Conference on Legionnaires Disease . From the point of view of the contractor, the paper discusses steps to reduce risks beginning with the design stage and following with procurement, construction, commissioning and testing and handover and maintenance stages. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING ELEMENTS-COMPLETE BUILDING SERVICES ELEMENTS-COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS | ||
| 650 | _aCOOLING TOWERS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING STANDARDS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c3004 _d3004 |
||