| 000 | 00770cab a2200229 4500 | ||
|---|---|---|---|
| 001 | ABS44609 | ||
| 008 | 090401t1991 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u47997 | ||
| 041 | _aeng | ||
| 100 | _aMacPherson, S. | ||
| 245 | _aValue engineering | ||
| 260 | _c1991 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Services _v13(3) March 1991, 35-36(2) |
||
| 520 | _aLast two parts of a series on value engineering (see also Abs 43897). Part two examines how firms in USA have applied the method and discusses problems in its implementation. Part three looks at difficulties with its use in the UK. | ||
| 650 | _aCOST MODELLING | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 700 | _aKelly, J. | ||
| 700 | _aWebb, R. | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c30172 _d30172 |
||