000 01188cab a2200301 4500
001 ABS50796
008 090401t1994 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u49462
041 _aeng
100 _aCatt, R.
245 _aDesigning against bomb blast
260 _c1994
350 _a0
490 _aCSM (Chartered Surveyor Monthly)
_v3(9) June 1994, 18(1)
520 _aSummary of a paper given at the building surveyors` National Briefing in Leeds, April 1994. The effects of bomb blasts in the City and the threat of further terrorist attacks has made designers rethink the way commercial buildings will be constructed in future. Suggests precautions to be taken by organisations and employers.
650 _aBOMB DAMAGE
650 _aCOMMERCIAL BUILDINGS
650 _aHEDGES M.
650 _aRICS BUILDING SURVEYORS NATIONAL BRIEFING
650 _aSECURITY IN BUILDINGS
650 _aTBV CONSULT
690 _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN
690 _aBUILDING AND CONSTRUCTION-REPAIRS AND MAINTENANCE
690 _aBUILT ENVIRONMENT-BUILDING STANDARDS
690 _aBUILDING AND CONSTRUCTION-SECURITY
942 _n0
948 _c04/03/1997
999 _c30955
_d30955