000 00849cab a2200277 4500
001 ABS51020
008 090401t1994 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u5333
041 _aeng
100 _aDavis, L.
245 _aIn the grip of recovery
260 _c1994
350 _a0
490 _aBuilding Economist
_vJuly 1994, 8-10(3)
520 _aConsiders the downside of the recovery, rising cost of materials and labour, and the difficulties in predicting tender price levels in this situation.
650 _aBUILT ENVIRONMENT-BUILDING COSTS
650 _aBUILT ENVIRONMENT-BUILDING MATERIALS
650 _aCONSTRUCTION INDUSTRY
650 _aEMPLOYMENT
650 _aLABOUR COSTS
650 _aRECOVERY
650 _aTENDER PRICES
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
948 _c04/03/1997
999 _c3173
_d3173