| 000 | 00665cab a2200205 4500 | ||
|---|---|---|---|
| 001 | ABS45207 | ||
| 008 | 090401t1991 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u51525 | ||
| 041 | _aeng | ||
| 100 | _aLloyd, H. | ||
| 245 | _aWords not as good as a bond for thwarted contractor | ||
| 260 | _c1991 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v256(7716) 11 October 1991, 34(1) |
||
| 520 | _aConsiders the role of bonds in building contracts in the light of a dispute between Fairclough and Zimmcor, which was settled out of court. | ||
| 650 | _aPERFORMANCE BONDS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c31988 _d31988 |
||