000 01093cab a2200241 4500
001 ABS45382
008 090401t1991 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u52620
041 _aeng
245 _aBuilding without conflict
260 _c1991
350 _a0
490 _aBuilding
_v15 November 1991, 16 pages
520 _aA special feature entitled "Building without conflict", the theme for the BEC one day conference held as part of Interbuild identifies five main areas of conflict: design, subcontracting, supervision, payment and collateral warranties. A representative contractor, architect and subcontractor puts forward its own viewpoint. Concludes with two Hong Kong case studies involving alternative dispute resolution and a general discussion on drawing up contracts.
650 _aALTERNATIVE DISPUTE RESOLUTION
650 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS-CONSTRUCTION COLLATERAL WARRANTY FORMS
650 _aDESIGN
650 _aSUBCONTRACTING
650 _aSUPERVISION
690 _aBUILT ENVIRONMENT
942 _n0
948 _c04/03/1997
999 _c32544
_d32544