000 00891cab a2200277 4500
001 ABS45544
008 090401t1991 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u53656
041 _aeng
100 _aStewart, A.
245 _aAll steamed up
260 _c1991
350 _a0
490 _aBuilding
_v256(7724) 6 December 1991, 70-71(2)
520 _aExamines criticism of the fully bedded method of double glazing as specified in BS6262 and specific complaints of faulty double glazing at Barratt`s Dulwich Gate estate, where an unsuitable linseed oil putty was used.
650 _aBS 5713
650 _aBS 6262
650 _aDOUBLE GLAZING
650 _aDOW CORNING HANSIL
650 _aDRAINED AND VENTILATED FRAMES
650 _aSEALANTS
650 _aWINDOWS
690 _aBUILDING AND CONSTRUCTION-DEFECTS AND FAILURES
942 _n0
948 _c04/03/1997
999 _c33031
_d33031