| 000 | 00891cab a2200277 4500 | ||
|---|---|---|---|
| 001 | ABS45544 | ||
| 008 | 090401t1991 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u53656 | ||
| 041 | _aeng | ||
| 100 | _aStewart, A. | ||
| 245 | _aAll steamed up | ||
| 260 | _c1991 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v256(7724) 6 December 1991, 70-71(2) |
||
| 520 | _aExamines criticism of the fully bedded method of double glazing as specified in BS6262 and specific complaints of faulty double glazing at Barratt`s Dulwich Gate estate, where an unsuitable linseed oil putty was used. | ||
| 650 | _aBS 5713 | ||
| 650 | _aBS 6262 | ||
| 650 | _aDOUBLE GLAZING | ||
| 650 | _aDOW CORNING HANSIL | ||
| 650 | _aDRAINED AND VENTILATED FRAMES | ||
| 650 | _aSEALANTS | ||
| 650 | _aWINDOWS | ||
| 690 | _aBUILDING AND CONSTRUCTION-DEFECTS AND FAILURES | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c33031 _d33031 |
||