| 000 | 00713cab a2200241 4500 | ||
|---|---|---|---|
| 001 | ABS45816 | ||
| 008 | 090401t1992 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u55202 | ||
| 041 | _aeng | ||
| 100 | _aByles, R. | ||
| 245 | _aExchange rate | ||
| 260 | _c1992 | ||
| 350 | _a0 | ||
| 490 |
_aNew Civil Engineer _v(983) 27 February 1992, 24(1) |
||
| 520 | _aReviews a report which highlights how contractors can make savings on costs by using hoists instead of tower cranes to move materials and personnel. | ||
| 650 | _aECONOMICS | ||
| 650 | _aPLANT HIRE | ||
| 650 | _aSCOTT CHANDLER | ||
| 650 | _aTOWER CRANES | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c33732 _d33732 |
||