| 000 | 00741cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS45830 | ||
| 008 | 090401t1992 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u55301 | ||
| 041 | _aeng | ||
| 100 | _aWillis, A. | ||
| 245 | _aClaim to fame | ||
| 260 | _c1992 | ||
| 350 | _a0 | ||
| 490 |
_aChartered Quantity Surveyor _v14(6) February 1992, 11-13(3) |
||
| 520 | _aA feature on the design and construction of Britain`s first Performing Arts and Technology School in Croydon, including details of the fitting out contract, summary of final costs and project information. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 650 | _aSCHOOLS | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c33775 _d33775 |
||