| 000 | 00872cab a2200229 4500 | ||
|---|---|---|---|
| 001 | ABS46031 | ||
| 008 | 090401t1992 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u56455 | ||
| 041 | _aeng | ||
| 245 | _aCanary Wharf Tower | ||
| 260 | _c1992 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Services _vMarch 1992, 19-45(22) |
||
| 520 | _aDesign aims, space planning, air conditioning, electrical installations, cabling for information technology requirements, and safety in event of fire are amongst features covered in this discussion of the construction of Canary Wharf Tower known as the Pelli Tower. Diagrams. Concludes with information on the design team. | ||
| 650 | _aCANARY WHARF TOWER | ||
| 650 | _aDESIGN | ||
| 650 | _aENGINEERING SERVICES | ||
| 650 | _aPELLI TOWER | ||
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c34428 _d34428 |
||