| 000 | 00931cab a2200253 4500 | ||
|---|---|---|---|
| 001 | ABS46341 | ||
| 008 | 090401t1992 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u57890 | ||
| 041 | _aeng | ||
| 100 | _aChevin, D. | ||
| 245 | _aChannel changer | ||
| 260 | _c1992 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v257(7747) 29 May 1992, 38-42(5) |
||
| 520 | _aCheriton terminal for the Channel Tunnel is being designed as it is being built, thus creating enormous demands for the construction team and cost consultants. This article reports on the design, costing, planning and environmental impact of the terminal`s erection and the claims arising from it. | ||
| 650 | _aCHANNEL TUNNEL TERMINAL | ||
| 650 | _aCHERITON PASSENGER TERMINAL | ||
| 650 | _aDESIGN | ||
| 650 | _aTRANSMANCHE LINK | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 690 | _aTRANSPORT AND COMMUNICATIONS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c35340 _d35340 |
||