| 245 | _aCladding failure | ||
| 260 | _c1992 | ||
| 350 | _a0 | ||
| 490 |
_aStructural Survey _v11(1) Summer 1992, 44-50(4) |
||
| 520 | _aCase study demonstrating how the cumulative effect of errors commonly made during the specification, design and installation stages of cladding system resulted in a defective, unsafe, uncomfortable building as well as a costly and disruptive lawsuit and remedial programme. | ||
| 650 | _aGLASS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING PATHOLOGY | ||