000 00815cab a2200277 4500
001 ABS46859
008 090401t1992 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u59788
041 _aeng
100 _aBirchmore, S.
245 _aFinding the right formula
260 _c1992
350 _a0
490 _aChartered Quantity Surveyor
_v14(11/12) July 1992, 9(1)
520 _aSummarises the actual cost and the formulae methods, such as Emden and Hudson`s formulae, for establishing additional overheads.
650 _aACTUAL COST
650 _aCONTRACT CLAIMS
650 _aEMDEN FORMULA
650 _aHUDSONS FORMULA
650 _aLOSS AND EXPENSE
650 _aOVERHEADS
650 _aPROFITS
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c04/03/1997
999 _c36753
_d36753