000 00653cab a2200205 4500
001 ABS46863
008 090401t1992 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u59816
041 _aeng
100 _aPowell-Smith, V.
245 _aPerformance could not be carried out by third party
260 _c1992
350 _a0
490 _aContract Journal
_v364(5886) 13 August 1992, 12(1)
520 _aDiscusses the case "Southway Group Ltd v Wolff" (WB2730-37) which concerned the right to subcontract building works.
650 _aSUBCONTRACTING
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c04/03/1997
999 _c36778
_d36778