| 000 | 00962cab a2200265 4500 | ||
|---|---|---|---|
| 001 | ABS47202 | ||
| 008 | 090401t1992 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u61032 | ||
| 041 | _aeng | ||
| 100 | _aCatt, R. | ||
| 245 | _aBlowing hot and cold | ||
| 260 | _c1992 | ||
| 350 | _a0 | ||
| 490 |
_aChartered Quantity Surveyor _v15(1) September 1992, 10-14(5) |
||
| 520 | _aOverview of air conditioning and ventilation systems looking at the different types available, the cost, the problems of sick building syndrome and building monitoring systems. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING ELEMENTS-COMPLETE BUILDING SERVICES ELEMENTS-COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS | ||
| 650 | _aBUILDING MONITORING SYSTEMS | ||
| 650 | _aCFCS | ||
| 650 | _aFAN COIL SYSTEMS | ||
| 650 | _aSICK BUILDING SYNDROME | ||
| 650 | _aVARIABLE REFRIGERENT VOLUME | ||
| 690 |
_aBlock management _96220 |
||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c37732 _d37732 |
||