000 01195cab a2200265 4500
001 ABS52109
008 090401t1995 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u61285
041 _aeng
245 _aEnvironment
260 _c1995
350 _a0
490 _aNew Civil Engineer
_v26 January 1995, 25-40(14)
520 _aSpecial report on environmental issues affecting civil engineers includes articles on the case by Barking and Dagenham against the Channel Tunnel rail link on the grounds of noise, vibration and dust, the establishment of the Bow Creek Ecology Park to encourage wildlife in the East End of London, contaminated land, ladfill, Environment Agency, recent moves to woo back public support for wind energy projects, educational changes needed and how contaminated silt from Birmingham`s canals was soil washed and dried to reduce its bulk and cut landfill costs.
650 _aCHANNEL TUNNEL RAIL LINK
650 _aCONTAMINATED LAND
650 _aENVIRONMENT AGENCY
650 _aENVIRONMENT BILL
650 _aRENEWABLE ENERGY
650 _aWIND ENERGY
650 _aWIND FARMS
690 _aEnvironment
_96238
942 _n0
948 _c04/03/1997
999 _c37934
_d37934