000 00753cab a2200217 4500
001 ABS47279
008 090401t1992 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u61377
041 0 _aeng
100 1 _aRidout, G.
245 0 0 _aOverblown design
260 _c1992
350 _a0
490 0 _aBuilding
_v257(7767) 23 October 1992, 56-57(2)
520 _aConsiders the problems which have arisen due to over specification of air-conditioning plant for office needs also examines possible solutions.
651 _aUnited Kingdom
_y
690 _aBUILT ENVIRONMENT-BUILDING ELEMENTS-COMPLETE BUILDING SERVICES ELEMENTS-COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS
700 _aChevin, D.
942 _n0
948 _c04/03/1997
999 _c38011
_d38011