| 000 | 01018cab a2200253 4500 | ||
|---|---|---|---|
| 001 | ABS47397 | ||
| 008 | 090401t1992 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u61814 | ||
| 041 | _aeng | ||
| 245 | _aCosting services | ||
| 260 | _c1992 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Services _v14(11) November 1992, 25-31(7) |
||
| 520 | _aThis feature on costing services looks at value engineering techniques, the emergence of guaranteed maximum price contracts and analyses air conditioning systems. Concludes with a discussion on the training and education of engineering quantity surveying specialists. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING ELEMENTS-COMPLETE BUILDING SERVICES ELEMENTS-COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS | ||
| 650 | _aCOST CONTROL | ||
| 650 | _aCOSTING | ||
| 650 | _aENGINEERING SERVICES | ||
| 650 | _aGUARANTEED MAXIMUM PRICE CONTRACTS | ||
| 650 | _aVALUE ENGINEERING | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c38335 _d38335 |
||