000 00579cab a2200193 4500
001 WB2721-60
008 090401t1991 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u62018
041 _aeng
245 _aTunnel rail link
260 _c1991
350 _a0
490 _aIndependent
_v28/5/91 p20
520 _aThe SoS for Transport is expected to delay a decision to give the go-ahead for the £3.5bn high-speed rail link with the Channel Tunnel until the autumn.
650 _aRAILWAYS
690 _aTRANSPORT AND COMMUNICATIONS
942 _n0
948 _c04/03/1997
999 _c38497
_d38497