| 000 | 00670cab a2200253 4500 | ||
|---|---|---|---|
| 001 | ABS47935 | ||
| 008 | 090401t1993 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u64114 | ||
| 041 | _aeng | ||
| 100 | _aChevin, D. | ||
| 245 | _aAll risks policy | ||
| 260 | _c1993 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v258(7777) 15 January 1993, 44-45 (2) |
||
| 520 | _aInvestigates the application of risk analysis to construction projects. | ||
| 650 | _aBOVIS | ||
| 650 | _aCONSTRUCTION PROJECTS | ||
| 650 | _aCRITICAL PATH ANALYSIS | ||
| 650 | _aHEATHROW | ||
| 650 | _aRISK ANALYSIS | ||
| 690 |
_aProject management _96261 |
||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c39914 _d39914 |
||