| 000 | 00759cab a2200205 4500 | ||
|---|---|---|---|
| 001 | ABS47968 | ||
| 008 | 090401t1993 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u64235 | ||
| 041 | _aeng | ||
| 100 | _aKnowles, R. | ||
| 245 | _aICE Design and Construct conditions | ||
| 260 | _c1993 | ||
| 350 | _a0 | ||
| 490 |
_aChartered Quantity Surveyor _v15(6) February 1993, 20(1) |
||
| 520 | _aGuide to the principal clauses of the ICE Design and Construct conditions of contract, where contractor is responsible for both design and build. Similarities with the ICE condition 6th edition are noted. | ||
| 650 | _aICE DESIGN AND CONSTRUCT CONDITIONS OF CONTRACT | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c39993 _d39993 |
||