| 000 | 00622cab a2200253 4500 | ||
|---|---|---|---|
| 001 | X289 | ||
| 008 | 090401t1992 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u64896 | ||
| 041 | _aeng | ||
| 100 | _aJanuary, M. | ||
| 245 | _aTime and costs in the construction industry | ||
| 260 | _c1992 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Economist _v32(2) September 1992, 15(1) |
||
| 650 | _aAUSTRALIA | ||
| 650 | _aCOST ESCALATION | ||
| 650 | _aCOSTS | ||
| 650 | _aRISE AND FALL FORMULAE | ||
| 650 | _aRISK | ||
| 650 | _aTIME | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c40434 _d40434 |
||