| 000 | 00807cab a2200205 4500 | ||
|---|---|---|---|
| 001 | WB3102-02 | ||
| 008 | 090401t1995 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u65829 | ||
| 041 | _aeng | ||
| 245 | _aDamages for breach of contract | ||
| 260 | _c1995 | ||
| 350 | _a0 | ||
| 490 |
_aEstates Gazette _v(9501) 7 January 1995, 110(1) |
||
| 520 | _aThe case of "Ruxley Electronics & Construction Ltd v Forsyth" (Abs51365) illustrates the ambiguities of the simple maxim: `where a party sustains a loss by reason of a breach of contract, he is ... to be placed in the same situation, with respect to damages, as if the contract had been performed`. | ||
| 650 | _aBREACH OF CONTRACT | ||
| 650 | _aDAMAGES | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c41104 _d41104 |
||