000 01006cab a2200277 4500
001 ABS53901
008 090401t1995 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u7273
041 _aeng
245 _aEzekiel and another v McDade and others
260 _c1995
350 _a0
490 _aEstates Gazette
_v[1995] 47 EG 150-153(4)
520 _aCA 24 November 1994. Defendants appealed against the decision that they had been negligent in surveying a property on the grounds that the 40mm gap in one end of a concrete purlin was not a serious defect. Appeal allowed to an extent to permit a reduction in damages payable to the plaintiff. ORC decision at Abs50956.
650 _aBISON SYSTEM
650 _aCONCRETE PURLIN
650 _aDEFECTS
650 _aEZEKIEL AND ANOTHER V MCDADE AND OTHERS
650 _aLIABILITY
650 _aMEASURE OF DAMAGES
650 _aNEGLIGENCE
650 _aVALUERS
690 _aBUILDING SURVEYING-CASE LAW
942 _n0
948 _c04/03/1997
999 _c4374
_d4374