| 000 | 01006cab a2200277 4500 | ||
|---|---|---|---|
| 001 | ABS53901 | ||
| 008 | 090401t1995 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u7273 | ||
| 041 | _aeng | ||
| 245 | _aEzekiel and another v McDade and others | ||
| 260 | _c1995 | ||
| 350 | _a0 | ||
| 490 |
_aEstates Gazette _v[1995] 47 EG 150-153(4) |
||
| 520 | _aCA 24 November 1994. Defendants appealed against the decision that they had been negligent in surveying a property on the grounds that the 40mm gap in one end of a concrete purlin was not a serious defect. Appeal allowed to an extent to permit a reduction in damages payable to the plaintiff. ORC decision at Abs50956. | ||
| 650 | _aBISON SYSTEM | ||
| 650 | _aCONCRETE PURLIN | ||
| 650 | _aDEFECTS | ||
| 650 | _aEZEKIEL AND ANOTHER V MCDADE AND OTHERS | ||
| 650 | _aLIABILITY | ||
| 650 | _aMEASURE OF DAMAGES | ||
| 650 | _aNEGLIGENCE | ||
| 650 | _aVALUERS | ||
| 690 | _aBUILDING SURVEYING-CASE LAW | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c4374 _d4374 |
||