| 000 | 00804cab a2200253 4500 | ||
|---|---|---|---|
| 001 | ABS49423 | ||
| 008 | 090401t1993 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u71174 | ||
| 041 | _aeng | ||
| 100 | _aScott, S. | ||
| 245 | 4 | _aThe nature and effects of construction delays | |
| 260 | _c1993 | ||
| 350 | _a0 | ||
| 490 |
_aConstruction Management & Economics _v11 1993, 358-369(12) |
||
| 520 | _aDescribes a method of assessing delay claims regularly used in the USA, together with procedures which have been proposed for dealing with concurrent delays. | ||
| 650 | _aCONCURRENT DELAYS | ||
| 650 | _aCONTRACT CLAIMS | ||
| 650 | _aCPM | ||
| 650 | _aCRITICAL PATH METHOD | ||
| 650 | _aDELAYS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c44836 _d44836 |
||