000 00670cab a2200193 4500
001 ABS37890
008 090401t1987 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u7433
041 _aeng
100 _aHuntley, C.
245 _aRest in pieces
260 _c1987
350 _a0
490 _aBuilding
_v252(31) 31 July 1987, 46-47(2)
520 _aDescribes the demolition method used for Lee House on London Wall in the City , which is being dismantled floor by floor. Explains the precautions being taken to minimise noise disturbance and to maximise the safety of passers-by and workmen.
690 _aBUILT ENVIRONMENT
942 _n0
948 _c04/03/1997
999 _c4490
_d4490