000 00729cab a2200205 4500
001 WB2510-05
008 090401t1989 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u71573
041 _aeng
245 _aSlot in home revolution
260 _c1989
350 _a0
490 _aBirmingham Post
_v3/3/89 p21
520 _aChanges in design and construction practices including factory finished components being slotted into place as house shells take shape on site, are being pioneered by a Midland housebuilder with the aim of improving productivity and quality while keeping down costs.
650 _aHOUSE BUILDING
650 _aSYSTEM BUILDING
690 _aBUILT ENVIRONMENT
942 _n0
948 _c04/03/1997
999 _c45144
_d45144