| 000 | 00857cab a2200241 4500 | ||
|---|---|---|---|
| 001 | ABS49743 | ||
| 008 | 090401t1993 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u72606 | ||
| 041 | _aeng | ||
| 100 | _aReynolds, F.M. | ||
| 245 | _aConceptual and early design estimating techniques for building heating, ventilation, and air conditioning systems | ||
| 260 | _c1993 | ||
| 350 | _a0 | ||
| 490 |
_aCost Engineering _v35(11) November 1993, 25-36(12) |
||
| 520 | _aDraws on information gathered for the compilation of a building services cost database as an aid to rapid calculation of costs in the early stages of a project. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 650 |
_aBlock management _96220 |
||
| 650 | _aHEATING | ||
| 650 | _aVENTILATION | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c45894 _d45894 |
||