000 00767cab a2200193 4500
001 ABS37916
008 090401t1987 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u7601
041 _aeng
100 _aHuntley, C.
245 _aFast cast
260 _c1987
350 _a0
490 _aBuilding
_v252(29) 17 July 1987, 68(1)
520 _aReports on the fast track construction of the West World office development at Hangar Lane in west London . John Laing has completed the structural frame of the 10-storey office block in just 22 weeks; achieved by a combination of traditional decking and flying forms. Compares this project with the Broadgate scheme by Bovis .
690 _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN
942 _n0
948 _c04/03/1997
999 _c4615
_d4615