100 _aPowell-Smith, V.
245 _aLeach and the architect
260 _c1994
350 _a0
490 _aContract Journal
_v372(5962) 17 February 1994, 10(1)
520 _aBrings out two aspects of "Merton LBC v Stanley Hugh Leach Ltd" (1985) on the role of the architect in adminstering the contract and efficiency in accurately recording each drawing issued.