| 100 | _aPowell-Smith, V. | ||
| 245 | _aLeach and the architect | ||
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v372(5962) 17 February 1994, 10(1) |
||
| 520 | _aBrings out two aspects of "Merton LBC v Stanley Hugh Leach Ltd" (1985) on the role of the architect in adminstering the contract and efficiency in accurately recording each drawing issued. | ||
| 650 | _aADMINISTRATION | ||
| 650 | _aAGENTS | ||
| 650 | _aARCHITECTS | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 650 | _aCONTRACT ADMINISTRATION | ||
| 650 | _aDRAWINGS | ||
| 650 | _aEMPLOYER | ||
| 650 | _aPROFESSIONAL CONDUCT | ||
| 650 | _aROLE | ||