000 00890cab a2200253 4500
001 ABS50233
008 090401t1994 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u74734
041 _aeng
245 _aHardened buildings
260 _c1994
350 _a0
490 _aBuilding Services
_vMarch 1994, 21-23 (2)
520 _aProvides an in-depth look at protective measures and strategies which can be used to prevent future damage to buildings, with specific regard to bomb blasts and work carried out on the NatWest Tower. blasts. Focuses on refurbishment strategy and contingency plans.
650 _aBISHOPSGATE
650 _aBOMB DAMAGE
650 _aDISASTER PLANNING
650 _aNATWEST TOWER
650 _aBUILT ENVIRONMENT-BUILDING MAINTENANCE AND REFURBISHMENT
650 _aTERRORISM
690 _aBUILT ENVIRONMENT
942 _n0
948 _c04/03/1997
999 _c47088
_d47088