| 000 | 01235cab a2200241 4500 | ||
|---|---|---|---|
| 001 | ABS50244 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u74809 | ||
| 041 | _aeng | ||
| 245 | _aSpecial report - design and build | ||
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aArchitects` Journal _v199(10) 9 March 1994, 35-43(9) |
||
| 520 | _aConsiders whether design and build as a form of procurement is efficient; how architects can control the quality of the product, particularly when acting as the employer`s agent and assesses implications for architects who switch from acting for the employer to the contractor. Argues that it is essential to adopt an approach which achieves a balance between efficiency and control over quality, emphasising the need for architects acting for the employer, to agree a level of quality with the client at the outset. Highlights the legal position, standards at risk and evident advantages. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 650 | _aDESIGN AND BUILD | ||
| 650 | _aHUNT THOMPSON ASSOCIATES | ||
| 650 | _aPROCUREMENT METHODS | ||
| 650 | _aSFA 1992 | ||
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c47134 _d47134 |
||