000 00701cab a2200205 4500
001 WB2607-04
008 090401t1990 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u75129
041 _aeng
245 _aStandard reduces quality claim
260 _c1990
350 _a0
490 _aNew Builder
_vno 20, 8/2/90 p6
520 _aThe property developer Stanhope has removed from all its contracts a clause which stipulates that contractors must comply with the quality standard BS 5750 , claiming that quality on site is being reduced rather than raised.
650 _aBUILDING INDUSTRY
650 _aQUALITY ASSURANCE
690 _aBUILT ENVIRONMENT
942 _n0
948 _c04/03/1997
999 _c47331
_d47331