| 000 | 00605cab a2200181 4500 | ||
|---|---|---|---|
| 001 | WB2527-03 | ||
| 008 | 090401t1989 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u75863 | ||
| 041 | _aeng | ||
| 245 | _aChannel Tunnel | ||
| 260 | _c1989 | ||
| 350 | _a0 | ||
| 490 |
_aChannel Fixed Link Newsletter _vNo28 June 1989 (6) |
||
| 520 | _aContains latest information about the Channel Tunnel: the main story being the Balfour Beatty Power contract to design and install the complete power distribution system for the Channel Tunnel | ||
| 690 | _aBUILT ENVIRONMENT | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c47725 _d47725 |
||