| 000 | 00822cab a2200277 4500 | ||
|---|---|---|---|
| 001 | ABS52396 | ||
| 008 | 090401t1995 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u75889 | ||
| 041 | _aeng | ||
| 100 | _aRussell, H. | ||
| 245 | _aCable care | ||
| 260 | _c1995 | ||
| 350 | _a0 | ||
| 490 |
_aNew Civil Engineer _v2 March 1995, 18-19(2) |
||
| 520 | _aLondon Electricity now prefers tunnelling to trenching for cabling. Reports on the 10km tunnel under south-west London, the methods and advantages during construction and for maintenance. | ||
| 650 | _aCABLING | ||
| 650 | _aLONDON ELECTRICITY | ||
| 650 | _aSTREET WORKS | ||
| 650 | _aTUNNELLING METHODS | ||
| 650 | _aTUNNELLING | ||
| 650 | _aTUNNELS | ||
| 650 |
_aUtilities _96272 |
||
| 690 | _aBUILT ENVIRONMENT | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c47741 _d47741 |
||