000 00667cab a2200217 4500
001 ABS50572
008 090401t1994 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u76508
041 _aeng
100 _aPhipps, M.
245 _aGetting it wrong first time
260 _c1994
350 _a0
490 _aBuilding Economist
_vApril 1994, 21(1)
520 _aReviews the modifications to JCT With Contractors Design 1981, introduced by Amendment 7.
650 _aAMENDMENT 7
650 _aJCT STANDARD FORM OF CONTRACT WITH CONTRACTOR'S DESIGN (1981 EDITION)
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c04/03/1997
999 _c48110
_d48110