| 000 | 00667cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS50572 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u76508 | ||
| 041 | _aeng | ||
| 100 | _aPhipps, M. | ||
| 245 | _aGetting it wrong first time | ||
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Economist _vApril 1994, 21(1) |
||
| 520 | _aReviews the modifications to JCT With Contractors Design 1981, introduced by Amendment 7. | ||
| 650 | _aAMENDMENT 7 | ||
| 650 | _aJCT STANDARD FORM OF CONTRACT WITH CONTRACTOR'S DESIGN (1981 EDITION) | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c48110 _d48110 |
||