| 000 | 01185cab a2200253 4500 | ||
|---|---|---|---|
| 001 | ABS50604 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u76625 | ||
| 041 | _aeng | ||
| 245 | _aSoS Transport v Birse-Farr Joint Venture | ||
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aConstruction Industry Law Letter _v(1994) CILL 903-904(2) |
||
| 520 | _aCommercial Court 7 April 1993. Dispute had arisen between B, a contractor, and S over a variation to the concrete specification. At arbitration B`s contention that it was under certified by the engineer to the sum of £291,213 was supported. B also claimed compound interest under ICE Conditions 5th editions Cl 60(6) for both the present and previous under-certifications. Interest was granted and S appealed. The court agreed that Cl 60(6) did not allow for compound interest. | ||
| 650 | _aCIVIL ENGINERRING CONTRACTS | ||
| 650 | _aCLAIMS | ||
| 650 | _aCOMPOUND INTEREST | ||
| 650 | _aICE CONDITIONS OF CONTRACT 5TH EDITION CL60(6) | ||
| 650 | _aMORGAN GRENFELL V SEVEN SEAS | ||
| 650 | _aUNDER-CERTIFICATION | ||
| 690 | _aBUILDING AND CONSTRUCTION-CASE LAW | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c48155 _d48155 |
||