| 000 | 00711cab a2200229 4500 | ||
|---|---|---|---|
| 001 | WB3313-03 | ||
| 008 | 090401t1997 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u77445 | ||
| 041 | _aeng | ||
| 245 | _aPrefab treatment for Tube | ||
| 260 | _c1997 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Design _v(1300) 21 March 1997, 4(1) |
||
| 520 | _aUsing prefabricated units for London Underground stations would cut construction costs by 30% according to a London Transport study. | ||
| 650 | _aCONSTRUCTION COSTS | ||
| 650 | _aLONDON UNDERGROUND | ||
| 650 | _aPREFABRICATED BUILDINGS | ||
| 650 | _aTRANSPORTATION | ||
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 942 | _n0 | ||
| 948 | _c26/03/1997 | ||
| 999 |
_c48699 _d48699 |
||