| 000 | 00799cab a2200229 4500 | ||
|---|---|---|---|
| 001 | WB3315-15 | ||
| 008 | 090401t1997 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u77763 | ||
| 041 | _aeng | ||
| 245 | _aIndustrial sites for housing | ||
| 260 | _c1997 | ||
| 350 | _a0 | ||
| 490 |
_aPlanning (for the Natural and Built Environment) _v11 April 1997,4(1) |
||
| 520 | _aIncreasing movement back from the suburbs has industrial sites accounting for half of the supply of residential land in Central and inner London. "Residential Development in Central and Inner London" London Residential Research. | ||
| 650 | _aCENTRAL LONDON | ||
| 650 | _aCONVERSION | ||
| 650 | _aINDUSTRIAL SITES | ||
| 650 | _aRESIDENTIAL USE | ||
| 690 | _aHOUSING-DEVELOPMENT | ||
| 942 | _n0 | ||
| 948 | _c17/04/1997 | ||
| 999 |
_c48882 _d48882 |
||