000 00739cab a2200241 4500
001 WB3220-02
008 090401t1996 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u8037
041 _aeng
245 _aCost of design errors
260 _c1996
350 _a0
490 _aBuilding Design
_v(1265) 17 May 1996, 3(1)
520 _aA report by the Construction Round Table says that errors in management and exchange of design information can cause up to 20-30% of project costs.
650 _aBUILT ENVIRONMENT-BUILDING COSTS
650 _aCAD
650 _aProject management
_96261
650 _aQUALITY CONTROL
650 _aREDUCTION
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
948 _c04/03/1997
999 _c4896
_d4896