| 000 | 00739cab a2200241 4500 | ||
|---|---|---|---|
| 001 | WB3220-02 | ||
| 008 | 090401t1996 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u8037 | ||
| 041 | _aeng | ||
| 245 | _aCost of design errors | ||
| 260 | _c1996 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Design _v(1265) 17 May 1996, 3(1) |
||
| 520 | _aA report by the Construction Round Table says that errors in management and exchange of design information can cause up to 20-30% of project costs. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 650 | _aCAD | ||
| 650 |
_aProject management _96261 |
||
| 650 | _aQUALITY CONTROL | ||
| 650 | _aREDUCTION | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c4896 _d4896 |
||