000 00720cab a2200205 4500
001 WB3318-04
008 090401t1997 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u78244
041 _aeng
245 _aBad feedback to blame for defects
260 _c1997
350 _a0
490 _aContract Journal
_v90(396) 7 May 1997, 2(1)
520 _aPoor communication is to blame for defects that increase construction costs by nearly a fifth according to an 18 month study "Towards a zero defect construction culture" jointly funded by the DoE and project partners.
650 _aCONSTRUCTION COSTS
650 _aDEFECTS
690 _aBUILT ENVIRONMENT-BUILDING PATHOLOGY
942 _n0
948 _c08/05/1997
999 _c49246
_d49246