| 100 | _aBrewer, G. | ||
| 245 | _aIn the final analysis | ||
| 260 | _c1997 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v390(6142) 10 September 1997, 23(1) |
||
| 520 | _aDiscusses the case "South Tyneside BC v John Mowlem and Co" which considered the finality of final certification by architects under JCT 1980 contract. | ||
| 650 | _aSOUTH TYNESIDE MDC V JOHN MOWLEM AND CO | ||
| 650 | _aCONTRACT CLAIMS | ||
| 650 | _aDEFECTS | ||
| 650 | _aFINAL CERTIFICATES | ||
| 650 | _aJCT STANDARD FORM OF BUILDING CONTRACT (1980 EDITION) | ||
| 650 | _aLIABILITY | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||