| 000 | 00725cab a2200253 4500 | ||
|---|---|---|---|
| 001 | ABS57740 | ||
| 008 | 090401t1997 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u81549 | ||
| 041 | _aeng | ||
| 100 | _aCurtis, K. | ||
| 245 | _aSizewell: the story so far | ||
| 260 | _c1997 | ||
| 350 | _a0 | ||
| 490 |
_aLandscape Design _v(264) October 1997, 22-25(4) |
||
| 520 | _aReviews the impact of the two nuclear power stations at Sizewell and considers the possibility of Sizewell C. | ||
| 650 | _aCOASTAL MANAGEMENT | ||
| 650 | _aCOASTLINE | ||
| 650 | _aNUCLEAR POWER STATIONS | ||
| 650 | _aSIZEWELL B | ||
| 650 | _aSUFFOLK | ||
| 690 | _aENVIRONMENTAL AND LAND CONSULTANCY | ||
| 942 | _n0 | ||
| 948 | _c20/10/1997 | ||
| 999 |
_c51382 _d51382 |
||