| 000 | 00821cab a2200277 4500 | ||
|---|---|---|---|
| 001 | ABS57702 | ||
| 008 | 090401t1997 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u81603 | ||
| 041 | _aeng | ||
| 100 | _aBoatland, J. | ||
| 245 | _aReduced rate | ||
| 260 | _c1997 | ||
| 350 | _a0 | ||
| 490 |
_aNew Civil Engineer _v2 October 1997, 18(1) |
||
| 520 | _aLooks at the amount of waste the construction industry generates each year and at the research CIRIA is doing to seek a remedy. Calculates the cost of waste. | ||
| 650 | _aCONSTRUCTION INDUSTRY | ||
| 650 | _aCONSTRUCTION WASTE | ||
| 650 | _aCONTROLLED WASTE | ||
| 650 | _aCOSTS | ||
| 650 | _aDEMOLITION SITES | ||
| 650 | _aRECYCLING | ||
| 650 | _aWASTE DISPOSAL | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c22/10/1997 | ||
| 999 |
_c51427 _d51427 |
||