| 000 | 00854cab a2200265 4500 | ||
|---|---|---|---|
| 001 | ABS58250 | ||
| 008 | 090401t1998 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u84279 | ||
| 041 | _aeng | ||
| 100 | _aBoden, P. | ||
| 245 | _aDumped on? | ||
| 260 | _c1998 | ||
| 350 | _a0 | ||
| 490 |
_aEstates Gazette _v(9807) 14 February 1998, 136-138(3) |
||
| 520 | _aDiscusses how the original concept of the design and build contract has become distorted with contractors being left out of the design process but still expected to take full liability for any problems. | ||
| 650 | _aCONSTRUCTION PROCUREMENT | ||
| 650 | _aCONTRACTORS | ||
| 650 | _aD&B | ||
| 650 | _aDESIGN AND BUILD CONTRACTS | ||
| 650 | _aLIABILITY | ||
| 650 | _aPROJECT MANAGERS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c17/02/1998 | ||
| 999 |
_c52953 _d52953 |
||