000 00648cab a2200217 4500
001 ABS58386
008 090401t1998 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u85216
041 _aeng
100 _aWinter, J.
245 2 _aA no-win situation
260 _c1998
350 _a0
490 _aConstruction News
_v(6557) 19 March 1998, 19(1)
520 _aThe author considers the impact that conditional fee arrangements could have on construction contract claims.
650 _aCONDITIONAL FEE AGREEMENTS
650 _aCONTRACT CLAIMS
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c26/03/1998
999 _c53561
_d53561