| 000 | 00621cab a2200229 4500 | ||
|---|---|---|---|
| 001 | ABS58537 | ||
| 008 | 090401t1998 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u85447 | ||
| 041 | _aeng | ||
| 100 | _aSeward, K. | ||
| 245 | _aDome or doom | ||
| 260 | _c1998 | ||
| 350 | _a0 | ||
| 490 |
_aLeisure Management _v18(3) March 1998, 34-37(4) |
||
| 520 | _aHighlights of the various zones inside the Millennium Dome, a look at costs and timetable. | ||
| 650 | _aCOSTS | ||
| 650 | _aMILLENNIUM DOME | ||
| 650 | _aYEAR 2000 | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 948 | _c06/04/1998 | ||
| 999 |
_c53733 _d53733 |
||