| 000 | 01031cab a2200265 4500 | ||
|---|---|---|---|
| 001 | ABS54135 | ||
| 008 | 090401t1995 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u8740 | ||
| 041 | _aeng | ||
| 245 | _aBuilding study: wholesale achievement | ||
| 260 | _c1995 | ||
| 350 | _a0 | ||
| 490 |
_aArchitects` Journal _v202(21) 30 November 1995, 29-39(10) |
||
| 520 | _aGives reports from the client, architect, structural engineer, services engineer, and contractor on how the John Menzies` Edinburgh HQ was designed and constructed. Includes an edited paper from the British Cement Association conference which refers to the building and includes a cost analysis and working details. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 650 | _aCOST ANALYSIS | ||
| 650 | _aENERGY EFFICIENT OFFICES | ||
| 650 | _aJOHN MENZIES EDINBURGH HEADQUARTERS | ||
| 650 | _aOFFICE BUILDINGS | ||
| 650 | _aOFFICE DESIGN | ||
| 650 | _aSCOTLAND | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c5420 _d5420 |
||