000 00904cab a2200253 4500
001 ABS58785
008 090401t1998 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u86252
041 _aeng
100 _aAl-Saggaf, H.A.
245 4 _aThe five commandments of construction project delay analysis
260 _c1998
350 _a0
490 _aCost Engineering
_v40(4) April 1998, 37-41(5)
520 _aPresents a formal procedure to follow in the analysis of why a delay has occurred on a construction project. Suggests methods of data gathering and analysis, identification of the root cause, classification of the type of delay, and assignment of responsibility.
650 _aCONTRACT CLAIMS
650 _aDATA GATHERING
650 _aDELAY ANALYSIS
650 _aDELAYS
650 _aLOSS AND EXPENSE
690 _aProject management
_96261
942 _n0
948 _c15/05/1998
999 _c54263
_d54263